Job Title: Wood Buffalo Extension
Project: Lynton Station
Client: Enbridge Pipelines (Athabasca)
Approximate Value: $600,000.00
Location of Work: Fort McMurray, Alberta Area
Year Completed: 2016
Scope of Work: Civil, mechanical, electrical, and concrete work
Excavate for existing pump building concrete floor slab extension. Form and pour floor slab, grade beams, and pump pedestal for building extension and pump addition. Installation of steel pilings for VFD building addition. Install new 5kV VCB in existing substation, including concrete foundation extension, and upsized feeders to new station transformer to accommodate additional station loads. Install structural, mechanical piping, and E&I inside pump building for new pump addition.